kashmir
BRO battles 15-foot snow walls to reopen Mughal road stretch
The operation from the Shopian side, completed in just over two weeks, required navigating avalanche-prone zones, icy surfaces and freezing temperatures in high-altitude terrain10:19 PM Feb 16, 2026 IST