latest-news
Desilting of Baglihar Dam underway in Ramban, all gates opened to flush out silt and debris
As the gates of Baglihar Hydroelectric Power Project dam were opened, a massive volume of muddy water, silt, and wooden debris was seen gushing into the River Chenab below the dam, reflecting the extent of sediment build-up over time01:32 PM Dec 07, 2025 IST