kashmir
Power shutdown
He said that the shutdown of the 33 KV Kangan Surfraw line will also be observed, due to which power supply to Surfraw, Gund, Gadribal, Kullan, Gagangeer, Sonamarg, Fraw, Ganiwan and adjoining areas will be affected from 10 am to 3.30 pm on December 1411:23 PM Dec 12, 2025 IST