For the best experience, open
https://m.greaterkashmir.com
on your mobile browser.

Slow pace of beautification work hits vehicular movement at Lal Chowk

07:27 AM Oct 18, 2023 IST | Auqib Salam
slow pace of beautification work hits vehicular movement at lal chowk
Advertisement

Srinagar: Commuters at the city centre Lal Chowk have expressed resentment against slow pace of beautification work under Smart City project saying it triggers traffic jam.

Advertisement
   

The commuters said that the slow pace of work on twin lanes opposite Biscoe School was taking a toll on them.

Advertisement

Commuters including the parents of school children in the vicinity said that they are having a tough time due to the slow pace of work on these lanes. They appealed to the authorities to speed up  work so that they won’t face problems.

Advertisement

“Although the major part of the work in Lal Chowk has been completed, the work on these lanes connecting with Budshah Chowk is still going on at a slow pace. This point has become a major traffic bottleneck, giving commuters a tough time. During peak hours, the traffic comes to a standstill,” said Farooq Ahmad, a commuter.

Advertisement

The locals said that the construction material lying around is also hampering pedestrian movement and poses risk of accidents.

Advertisement

“This material has occupied space and hampers even pedestrian movement. We understand that it is a development project and it is good for the face-lifting of the city, but all we want is that the work should be expedited so that we don’t suffer,” Zaid Ahmad, a student, said.

Advertisement

The locals said that ahead of winter, the issue will add to the problems during rain and snow. They appealed to the authorities to finish the work without any delay.

Advertisement

Advertisement
×