KPDCL announces power shutdown in Kashmir parts
Srinagar, Oct 17: According to the Chief Engineer, Distribution, KPDCL, in order to carry out erection of poles in connection with augmentation of conductor 0.05 ACSR to 0.1 ACSR of 33KV Awantipora- Airfield Line, the shutdown shall be observed to Quil LIS Stage-Ist on 23, 24, 26, 27, 29 and 30th October from 09 am to 05:00 am, and no area shall remain affected.
Similarly, to carry out the augmentation of 33KV Pampore-Pulwama line, the power supply to Kadlabal and Wagoora area shall remain affected from 09:00 AM to 05:00 PM on 20 and 22nd of October, 2024.
Also, to carry out branch cutting of 33 KV Nihalpora- Gulmarg line the power supply to Tangmarg main and Kulhama areas shall remain affected from 10:00 AM to 04:00 PM on 21st of October, 2024.
Likewise, to carry out twinning/ stabilization and branch cutting of 33KV Amargarh- Arampora line, the power supply to Arampora, Sher Colony, Nigli and Panzipora areas shall remain from 10:00 AM to 04:00 PM on 22nd of October, 2024.